Home
About Us
FAQ
Articles
Services
Project Portfolio
Contact Us
Links
Client Login
Project Portfolio
Matthew Knight Arena - U of O
A scissor lift struck this overhang, crushing the wood.
Reed College Dorm Lobby
This lobby room was rebuilt using as much existing wood as possible. The false door had an electrical switch hole. The contractor brought us in to fill and blend in the holes in false door.
Statue finger
Miraculously, only the statues' right index finger was broken this time.
Ceiling camera
The electricians should have used a round box, but they didn't...
Bed Headboard Transit Damage
This cherry headboard was damaged in transit. The moving company brought us in to repair the dents.
Entertainment center
The veneer was chipped while in transit.
Door repair
Trade damage occurred, and the contractor needed the door repaired so the space would show well to perspective tenants.
Cushion seam
The seam failed on this new chair, so the manufacturer called Image Restoration, Inc. to repair it.
Clackamas Developmental Services
Handrail with paint and filler deposits on the finish
Door jamb
This jamb was damaged during construction of a new building in downtown Portland.
Footboard
This footboard was broken in two along the length.
© Copyright 2008 - 2013, Image Restoration, All Rights Reserved
News
Moving
AMSA
CPPC
Construction
Furniture
How To
Moving Industry
Construction Industry
Retail